Economic data

The figures below give a first insight of the economic efficiency. Our calculation models allow the rapid assessment and calculation according to individual parameters.

We can so provide a a first overview of the economic data of a designed plant using this impressive technology.


Biomethane generation costs

Biogas plant with raw gas capacity of 500 Nm³/h. Gas processing via      3-step BioMem membrane separation process with Membrane Module SEPURAN® Green from Evonik.

All diagramm-details are bench marks. [Spring: www.biogaseinspeisung.de]


Electrical power demand depending on the raw gas flow

 

All diagramm-details are bench marks. [Spring: www.biogaseinspeisung.de]


Specific upgrading costs depending on the plant size

Specific gas processing costs pro kWh.
(Product gas quality >98%, 3-step process).

All diagramm-details are bench marks.