Full Scale Plant Sachsendorf (Germany)

For the customer EnviTec Biogas AG in October 2012, the first commercial implementation of a biogas treatment plant with EVONIK SEPURAN® Green Membrane modules was delivered. The facility is construed for a raw gas flow rate of 150-200 Nm3 / h and designed in a 3-stage process for the lowest methane slip.

GAH has performed with our engineers the complete procedural basic and detailed engineering, construction, pre-commissioning (in cooperation with TÜV Austria following the current valid safety standards) and commissioning in Sachsendorf in close cooperation with the customer and the membrane manufacturer.

The results meet the high expectations and pre-calculations or even exceed them.